Gradeability SP 80 mm | 57 % 57 % |
Reserve | 9,5 1/min 9,5 1/min |
Travel speed stage 1 | 1,7 m/H 2,8 km/h |
Travel speed stage 2 | 3 m/H 4,9 km/h |
Break Out Force Bucket | 5.076,2 lbf 22,6 kN |
Break Out Force Lift Arm | 3.527,3 lbf 15,7 kN |
EZ26e
Gradeability SP 80 mm | 57 % 57 % |
Reserve | 9,5 1/min 9,5 1/min |
Travel speed stage 1 | 1,7 m/H 2,8 km/h |
Travel speed stage 2 | 3 m/H 4,9 km/h |
Break Out Force Bucket | 5.076,2 lbf 22,6 kN |
Break Out Force Lift Arm | 3.527,3 lbf 15,7 kN |
Length | 181,3 " 4.604 mm |
Operating weight (min.-max.) | 5.379,3- 6.666,8 lb 2.440- 3.024 kg |
Digging depth (max.) | 110,4 " 2.803 mm |
Width | 59,1 " 1.500 mm |
Height | 99,4 " 2.524 mm |
Nominal power | 39 KW 39 KW |
Nominal current | 350 A 350 A |
Nominal voltage | 96 V 96 V |
Nominal speed | 2.450 1/min 2.450 1/min |
Power factor (cos φ) | 0,9 cos φ 0,9 cos φ |
Motor type | Synchronous reluctance motor |
Battery runtime | 7- 8 h 7- 8 h |
Charging Time | 2,1- 10,5 h 2,1- 10,5 h |
Type of battery | Li-Ion |
Operating pressure hydraulics | 3.480 psi 240 bar |
Flow rate max. | 18,1 gal/mi 68,6 l/min |
Operating pressure slewing gear | 220 bar 220 bar |
Hydraulicpump | Axial piston pump |